Westlayer Coatings

METAL ROOF REPAIRS

How to assess cut edge corrosion on a metal roof

Find out what a survey should record at sheet ends, overlaps and fixings, and how the findings inform the scope of repair.

Start where the steel is exposed

A profiled metal roof can show corrosion along the exposed cut ends of sheets, around overlapping ends or where a sheet has been trimmed at a detail. From ground level or from existing inspection photographs, look for a rusty line following the sheet edge, lifted factory finish or staining below a lap. Mark these areas on a roof plan or identify them with bay numbers. Leave any close examination to the surveyor.

Ask what remains below the lifted finish

The visible width of a rust line is only part of the picture. A close inspection should explain whether corrosion has moved under the coating or into the overlap and whether the parent sheet can still support the proposed repair. Ask the surveyor to distinguish surface corrosion from thinning, holes, fractured edges or movement. Request photographs of representative details if they can be collected safely.

Keep laps, fixings and drainage in the same survey

A line of rust at an edge may occur alongside loose fasteners, failed washers, disturbed laps or standing water. A collar around a vent or an old patched detail can also be relevant. Ask the contractor to record these defects separately and explain which are contributing to water entry. This gives you a basis for selecting an edge treatment and any repair the roof also needs.

Compare targeted work with a wider roof scope

Targeted treatment may suit localised edge breakdown where the surrounding finish and sheets remain sound. A wider coating system may be worth pricing if weathering extends across the sheet faces. Where the survey identifies significant metal loss, ask for the affected sheets to be flagged for assessment or replacement and for the boundaries between new and existing work to be shown.

Look for changes between roof bays

A later extension or past repair can introduce a different sheet profile, factory finish or age of metal. Ask the surveyor to sample each distinct area before specifying the same treatment across the entire building. If some laps are inaccessible, ask how that will affect the price and the extent of the work.

Ask for a schedule of the edges to be treated

Record the affected runs, which fixings or overlaps are included and what happens if the extent only becomes clear during preparation. Compare that schedule against the drawings and building use before you agree the work. At handover, keep representative before and after photographs and a record of any areas the contractor identified for further checks.

Sources and further reading

Related reading.

Services to consider.

Put your job into words.

Build a brief you can use when discussing the project.

Plan an enquiry